U-Arena

ASL partnered with its French distribution partner FreeVox and project integrator Videlio, France, to deliver a comprehensive EN54 compliant, multizoned sound system for the new arena’s public and performance spaces. This project was a technical first for ASL as it embraces an entwined Dante™ and fully EN54 compliant, single system solution within the entire venue.

Holmestrand Railway Station

Holmestrand train station is a new station engineered into the mountainside of the Holmestrand municipality along a tunnel 12km in length. The officially titled “Holm-Nykirke project” incorporating the construction of the double-track tunnel and the construction of the train station began in the Summer 2010. Blasting of the rock cavern, to thirty five metres wide and eighteen metres high commenced in December 2011 and concluded in 2014.

Klang Valley MRT

The Klang Valley Mass Rapid Transit (MRT) railway line in Malaysia was the first of three new lines planned to serve the Greater Kuala Lumpur area, with 31 stations serving a population of 1.2 million. The 51km-long line required a multi-node distributed Passenger Information Display System (PIDS) to display live train information, synchronised PA/PIDS messages, images and logos, safety messages and billable advertising. This was also required to integrate with the Public Address Voice Alarm (PAVA) equipment, so that screens located on the station platforms would display emergency information and wayfinding in the event of an emergency.